This page was automatically translated and may contain errors. View in English.
WSP in the Middle East

Assistant Resident Engineer – MEP (Data Centre Construction)

WSP in the Middle East

Riyadh, Riyadh Province, Saudi Arabia · ಪೂರ್ಣ ಸಮಯ

ಅರ್ಜಿ ಸಲ್ಲಿಸುವವರಲ್ಲಿ ಮೊದಲಿಗರಾಗಿರಿ

ಅನುಭವ
15+ ವರ್ಷಗಳು
ಸಂಬಳ
ತೆರೆಯುವಿಕೆಗಳು
1
ಪೋಸ್ಟ್ ಮಾಡಲಾಗಿದೆ
2 ಗಂಟೆಗಳ ಹಿಂದೆ
ಕೆಲಸದ ಮೋಡ್
ಕಚೇರಿಯಲ್ಲಿ
ವಿದ್ಯಾಭ್ಯಾಸ
Bachelor's degree in Electrical or Mechanical Engineering
ಪುನರಾರಂಭ
ಅರ್ಜಿ ಸಲ್ಲಿಸಲು ಕಡ್ಡಾಯ

ನೀವು ಎಲ್ಲಿ ಕೆಲಸ ಮಾಡುತ್ತೀರಿ

ಕೆಲಸದ ವಿವರ

Job Overview

WSP Middle East is looking for a seasoned Assistant Resident Engineer specializing in MEP systems for an extensive data centre project near Riyadh. This full-time, on-site position demands active supervision from mobilisation through commissioning to ensure exceptional construction quality and coordination of mechanical, electrical, and plumbing installations.

Primary Responsibilities

  • Lead daily supervision of MEP construction activities throughout every phase of the project.
  • Monitor contractor outputs for compliance with project specifications and schedules.
  • Verify that construction adheres to approved drawings and industry standards.
  • Review and sanction shop drawings, method statements, and material submissions.
  • Supervise installation of MEP components including electrical, mechanical, HVAC, ELV, and ICT systems.
  • Ensure systems meet mission-critical design criteria such as uptime, redundancy, and resilience.
  • Serve as principal liaison among clients, EPC contractors, consultants, and internal stakeholders.
  • Help resolve technical and on-site challenges promptly.
  • Participate in coordination and progress meetings, delivering detailed updates.
  • Implement rigorous quality assurance processes and inspection protocols.
  • Confirm installations comply with project demands, international standards, and local regulations.
  • Facilitate testing, commissioning, and validation of completed systems.
  • Champion a safety-first culture in all site operations following WSP and client HSE guidelines.
  • Track project milestones, report delays or risks, and assist in planning mitigations.
  • Supervise system commissioning activities ensuring readiness aligned with data centre operational targets.
  • Support documentation and closure of final handover procedures.

Qualifications

  • Bachelor’s degree in Electrical or Mechanical Engineering.
  • More than 15 years’ experience, particularly with data centre or mission-critical infrastructure projects.
  • Extensive history in onsite construction supervision roles.
  • In-depth knowledge of MEP systems and data centre infrastructure including power, cooling, and ICT.
  • Experience collaborating with EPC contractors on large-scale developments.
  • Previous work experience in the Middle East, ideally Saudi Arabia.

ನಿಮಗೆ ಪ್ರತ್ಯುತ್ತರ ಬೇಕಾದರೆ ಅದನ್ನು ಬಿಡಿ — ನಾವು ಅದನ್ನು ಬೇರೆ ಯಾವುದಕ್ಕೂ ಬಳಸುವುದಿಲ್ಲ.

ಬ್ರೌಸ್ ಮಾಡಲು ಕ್ಲಿಕ್ ಮಾಡಿ, ಎಳೆಯಿರಿ ಮತ್ತು ಬಿಡಿ, ಅಥವಾ ಅಂಟಿಸಿ ಸ್ಕ್ರೀನ್‌ಶಾಟ್

PNG, JPG, GIF, MP4, WebM, MOV · ಪ್ರತಿಯೊಂದೂ ಗರಿಷ್ಠ 20MB · 5 ಫೈಲ್‌ಗಳವರೆಗೆ

🤖
ಆನ್‌ಲೈನ್ · ತ್ವರಿತ AI ಸಹಾಯ