Assistant Resident Engineer – MEP (Data Centre Construction)
Riyadh, Riyadh Province, Saudi Arabia · À temps plein
Soyez le premier à postuler
- Expérience
- 15 ans et plus
- Salaire
- —
- Ouvertures
- 1
- Publié
- il y a 4 heures
- Mode de travail
- Au bureau
- Éducation
- Bachelor's degree in Electrical or Mechanical Engineering
- CV
- Candidature requise
Votre lieu de travail
Description de l'emploi
Job Overview
WSP Middle East is looking for a seasoned Assistant Resident Engineer specializing in MEP systems for an extensive data centre project near Riyadh. This full-time, on-site position demands active supervision from mobilisation through commissioning to ensure exceptional construction quality and coordination of mechanical, electrical, and plumbing installations.
Primary Responsibilities
- Lead daily supervision of MEP construction activities throughout every phase of the project.
- Monitor contractor outputs for compliance with project specifications and schedules.
- Verify that construction adheres to approved drawings and industry standards.
- Review and sanction shop drawings, method statements, and material submissions.
- Supervise installation of MEP components including electrical, mechanical, HVAC, ELV, and ICT systems.
- Ensure systems meet mission-critical design criteria such as uptime, redundancy, and resilience.
- Serve as principal liaison among clients, EPC contractors, consultants, and internal stakeholders.
- Help resolve technical and on-site challenges promptly.
- Participate in coordination and progress meetings, delivering detailed updates.
- Implement rigorous quality assurance processes and inspection protocols.
- Confirm installations comply with project demands, international standards, and local regulations.
- Facilitate testing, commissioning, and validation of completed systems.
- Champion a safety-first culture in all site operations following WSP and client HSE guidelines.
- Track project milestones, report delays or risks, and assist in planning mitigations.
- Supervise system commissioning activities ensuring readiness aligned with data centre operational targets.
- Support documentation and closure of final handover procedures.
Qualifications
- Bachelor’s degree in Electrical or Mechanical Engineering.
- More than 15 years’ experience, particularly with data centre or mission-critical infrastructure projects.
- Extensive history in onsite construction supervision roles.
- In-depth knowledge of MEP systems and data centre infrastructure including power, cooling, and ICT.
- Experience collaborating with EPC contractors on large-scale developments.
- Previous work experience in the Middle East, ideally Saudi Arabia.