This page was automatically translated and may contain errors. View in English.
Insight Global

Construction Scheduler

Insight Global

Boise, Indonesia · Contrato

Sé el primero en postularte

Experiencia
Más de 2 años
Salario
USD 40 – USD 55 / hour
Vacantes
1
Al corriente
Hace 3 horas
Modo de trabajo
En la oficina
Educación
Diploma de escuela secundaria o GED
Elegibilidad
Candidates with the required construction scheduling background, a high school diploma or GED, and experience with Oracle Primavera P6 are eligible to apply. A bachelor's degree in construction management or a related engineering discipline is preferred but not mandatory.
Reanudar
Se requiere solicitud

Dónde trabajarás

Descripción del trabajo

Role overview

This opportunity is for a Construction Scheduler supporting a hyper-scale advanced manufacturing project in Boise, Idaho. The role focuses on creating, maintaining, and refining construction schedules for the general contractor on the project.

Key duties

  • Develop and update project schedules for the general contractor.
  • Manage construction scheduling activities for a large industrial/commercial build.
  • Work with complex schedules containing roughly 3,000 to 5,000 activities per individual schedule.

Required background

  • High school diploma or GED is required.
  • At least 2 years of experience in construction scheduling on large industrial or commercial projects.
  • Prior experience working for either a general contractor or subcontractor.
  • Hands-on experience with Oracle Primavera P6.

Preferred background

  • A bachelor's degree in construction management or a related engineering field is preferred.

Work details

This is a contract assignment expected to last 1 to 2 years, with a potential full-time opportunity afterward. The pay rate is $40 to $55 per hour depending on experience and education. The schedule is approximately 50 hours per week, typically in 10-hour shifts.

Déjelo si desea una respuesta; no lo utilizaremos para ningún otro fin.

Haz clic para navegar, arrastrar y soltar, o pasta una captura de pantalla

PNG, JPG, GIF, MP4, WebM, MOV · Máximo 20 MB cada uno · Hasta 5 archivos

🤖
En línea · Ayuda instantánea con IA